Avinor demands fix after quality inspection finds new Rana airport control tower out of plumb
Avinor has formally complained to the Kongsberg Group after discovering that the control tower at the new Mo i Rana Airport (MON) does not meet required vertical alignment tolerances. The deviation was identified during a routine quality inspection after the tower had been fully assembled. According to Avinor, the structure is slightly out of plumb, […]